Home Services What we do Dirt Work & Grading Drainage & Ditch Work Hardscaping Site Prep Demolition Land Clearing Gallery Service Area Where we work Hillsboro Festus De Soto Arnold Imperial Pevely High Ridge Fenton Oakville Mehlville Sunset Hills Kirkwood Valley Park Affton Contact
(314) 698-0887 Free Estimate

Site Prep

Ground made ready to build on: stripped, cut to grade, compacted, topped with base rock and graded to drain.

Overview

What Site Prep Involves

We prepare ground for sheds, shops, garages, additions, driveways and patios.

We strip the topsoil, cut the ground to level, compact it, lay base rock and grade it to drain.

A compacted gravel pad built under a new steel carport, the ground around it cut to grade and strawed

Scope of work

What’s Included

  • Topsoil strip and stockpile
  • Cut to grade and compaction
  • Base rock placed and leveled
  • Building, shed and garage pads
  • Driveway and parking bases
  • Positive drainage away from the build

Common reasons

When to Call Us

  • A shed, shop, garage or addition going in and no pad yet
  • A concrete crew asking for a prepared, compacted base
  • A new drive or parking area that needs a subgrade before rock
  • Ground that falls toward where the building is going
  • A previous pad that has settled, cracked or gone out of level
  • Topsoil that needs stripping and somewhere to put it

Our process

How It Works

STEP 01

Set Height and Footprint

We mark where the build goes and set its finished height relative to the ground and the house.

STEP 02

Strip and Stockpile

We strip the topsoil and set it aside for reuse.

STEP 03

Cut and Compact

We cut the ground to level and compact it.

STEP 04

Base Rock and Drainage

We place and level base rock, then shape the ground around it so water runs away.

FAQs

Frequently Asked Questions

Why strip the topsoil instead of building on it?
Topsoil settles under weight. We strip it, save it and put it back around the finished work.
Do I need base rock under a shed?
It depends on the shed and the ground. We check at the estimate.
Can you prep a pad for a concrete crew?
Yes. Send us the size, finished height and any specs from the concrete crew.
Who calls 811 before you dig?
Utilities must be marked by calling 811 before digging. We decide at the estimate who makes the call.

Get a Free Estimate

Tell us the address and what you need done. We’ll come out, look at the job and give you a free estimate. Repeat customers get 10% off.